01/10/02
|
Ordered our F1 Rocket from Mark Frederick
|
|
02/01/02
|
Registered N82NM for our F1
|
|
03/31/02
|
Took delivery in Tyler, TX of our F1 Rocket s/n 82 and drove her back to KC in a Penske Truck!
|
|
11/19/02
|
Shop is near completion and beginning to inventory our birds parts
|
|
12/28/02
|
Remove floor panels from fuse and prep panels for riveting the floor bracing
|
|
01/03/03
|
Drilled empennage deck holes to be riveted at a later time
|
|
01/15/03
|
Completed riveting floor panel braces
|
|
01/25/03
|
Cut rudder cable slots at rear of fuse and built rudder cable exit clamps and procured slot fairings
|
|
02/10/03
|
Completed baggage compartment floors and bracing
|
|
03/01/03
|
Procured autopilot servos from Trutrak (Jim Younkin)
|
|
06/10/03
|
Initial building of rigging of Pilot rudder pedal assembly
|
|
06/12/03
|
Remove front instrument panel skin and instrument panel for easy access to rudder pedal area
|
|
06/13/03
|
Shipped F1 exhaust back to Larry Vetterman for the 2” Macho pipe upgrade......... ARRRGGGGGHH!
|
|
7/11/03
|
Field trip to Tulsa to visit with Monty Barrett of BPA about our engine build
|
|
9/15/03
|
Welded center control rod and assembled control sticks
|
|
9/30/03
|
Finished rear baggage closeout. Assembled upper floor and rear baggage closeout
|
|
10/07/03
|
Install nutplates on pilot floor and attach pilots floor
|
|
2/1/04
|
Construct Pilot seat back
|
|
2/15/04
|
Begin construction of rudder pedals
|
|
3/1/04
|
Work on Pilot floor and seat back attach point. Installed nutplates for flooring
|
|
4/10/04
|
Work on battery tray and autopilot installation
|
|
5/5/04
|
Finish ELT and Battery tray installation. Hinged the access to the battery and ELT.
|
|
7/28/04
|
Began work on rear spar for empennage. Fabricated adjustable pilot seat, drilled front weldments.
|
|
8/15/04
|
Continued work on Rear spar for H-stab and worked on cockpit rails
|
|
9/03/04
|
Finished rear spar for h-stab and mounted in jig, continued work on cockpit rails
|
|
9/28/04
|
Finished and mounted Cockpit rails
|
|
10/15/04
|
Finished front seat back weldment and mounted windshield bow
|
|
11/15/04
|
Mount Throttle and fabricate cover. Also worked on Horizontal Stab in Jig.
|
|
11/28/04
|
Finish Throttle quad and rivet H stab skeleton
|
|
1/16/05
|
Worked on Rudder pedal assemblies. Installing MKII flap system in Fuse.
|
|
2/22/05
|
Drilled H Stab skins and clamped in place
|
|
2/25/05
|
Install Flap Motor
|
|
08/01/05
|
Completed battery box. Horizontal skins are ready for riveting. Fabricating rear passenger panels.
|
|
08/30/05
|
Horizontal tail is together and out of the jig. Started work on Vert. Stab. Continued on rear seat.
|
|
09/15/05
|
Finished riveting horizontal tail............done!
|
|
09/15/07
|
Trip to Collinsville, OK (America’s Engines) to build our IO-540 for the Rocket
|
|
10/15/05
|
Finished rear seat panels. Now working on rudder pedals and vert stab
|
|
12/15/07
|
Hung the IO-540 on the beast
|
|
11/01/07
|
Put the F1 up on the gear
|
|
01/15/07s
|
Ordered firewall penetration kits and fittings for the engine
|
|
01/21/07
|
Firewall penetratons for fuel line and brake line bulkheads. Also installed heat box
|
|
01/30/07
|
Install oil cooler and fuel line fitting on engine. Put stringers in left and right elevator skins
|
|
02/04/07
|
Firewall penetrations for wiring, hook up heat box and parking brake. Trim vert. for rudder
|
|
02/15/07
|
Working on Elevators and covering firewall with insulation
|
|
03/15/07
|
Finished Rudder Pedals
|
|
04/15/07
|
Ordered brake hoses
|
|
05/10/07
|
Begin work on fiberglass engine cowl. Fitting and trimming
|
|
01/10/2008
|
Finish Tail surfaces - trim module, counterbalance cutouts, etc.
|
|
02/28/2008
|
Working on Panel layout and design
|
|
04/06/08
|
Attach Horizontal Stab
|
|
04/15/08
|
Attach Vertical Stab
|
|
05/01/08
|
Attach wings and install control sticks and control rods
|
|
06/01/08
|
Trim Vertical and attach rudder
|
|
06/09/08
|
Build and attach rudder stops
|
|
06/15/08
|
Fit rudder tip and elevator tips
|
|
06/24/08
|
Install tailwheel link
|
|
07/20/08
|
Fabricate rear control stick closeout
|
|
07/23/08
|
Fabricate fuel tank support brackets
|
|
07/24/08
|
Fitting horizontal fiberglass tips
|
|
08/01/08
|
Fabricate Fuel vent fittings and work on Fuel tank removal
|
|
08/06/08
|
Leak check fuel tanks and install fuel vent lines
|