Builder's Log

01/10/02

Ordered our F1 Rocket from Mark Frederick

02/01/02

Registered N82NM for our F1

03/31/02

Took delivery in Tyler, TX of our F1 Rocket s/n 82 and drove her back to KC in a Penske Truck!

11/19/02

Shop is near completion and beginning to inventory our birds parts

12/28/02

Remove floor panels from fuse and prep panels for riveting the floor bracing

01/03/03

Drilled empennage deck holes to be riveted at a later time

01/15/03

Completed riveting floor panel braces

01/25/03

Cut rudder cable slots at rear of fuse and built rudder cable exit clamps and procured slot fairings

02/10/03

Completed baggage compartment floors and bracing

03/01/03

Procured autopilot servos from Trutrak (Jim Younkin)

06/10/03

Initial building of rigging of Pilot rudder pedal assembly

06/12/03

Remove front instrument panel skin and instrument panel for easy access to rudder pedal area

06/13/03

Shipped F1 exhaust back to Larry Vetterman for the 2” Macho pipe upgrade......... ARRRGGGGGHH!

7/11/03

Field trip to Tulsa to visit with Monty Barrett of BPA about our engine build

9/15/03

Welded center control rod and assembled control sticks

9/30/03

Finished rear baggage closeout. Assembled upper floor and rear baggage closeout

10/07/03

Install nutplates on pilot floor and attach pilots floor

2/1/04

Construct Pilot seat back

2/15/04

Begin construction of rudder pedals

3/1/04

Work on Pilot floor and seat back attach point. Installed nutplates for flooring

4/10/04

Work on battery tray and autopilot installation

5/5/04

Finish ELT and Battery tray installation. Hinged the access to the battery and ELT.

7/28/04

Began work on rear spar for empennage. Fabricated adjustable pilot seat, drilled front weldments.

8/15/04

Continued work on Rear spar for H-stab and worked on cockpit rails

9/03/04

Finished rear spar for h-stab and mounted in jig, continued work on cockpit rails

9/28/04

Finished and mounted Cockpit rails

10/15/04

Finished front seat back weldment and mounted windshield bow

11/15/04

Mount Throttle and fabricate cover. Also worked on Horizontal Stab in Jig.

11/28/04

Finish Throttle quad and rivet H stab skeleton

1/16/05

Worked on Rudder pedal assemblies. Installing MKII flap system in Fuse.

2/22/05

Drilled H Stab skins and clamped in place

2/25/05

Install Flap Motor

08/01/05

Completed battery box. Horizontal skins are ready for riveting. Fabricating rear passenger panels.

08/30/05

Horizontal tail is together and out of the jig. Started work on Vert. Stab. Continued on rear seat.

09/15/05

Finished riveting horizontal tail............done!

09/15/07

Trip to Collinsville, OK (America’s Engines) to build our IO-540 for the Rocket

10/15/05

Finished rear seat panels. Now working on rudder pedals and vert stab

12/15/07

Hung the IO-540 on the beast

11/01/07

Put the F1 up on the gear

01/15/07s

Ordered firewall penetration kits and fittings for the engine

01/21/07

Firewall penetratons for fuel line and brake line bulkheads. Also installed heat box

01/30/07

Install oil cooler and fuel line fitting on engine. Put stringers in left and right elevator skins

02/04/07

Firewall penetrations for wiring, hook up heat box and parking brake. Trim vert. for rudder

02/15/07

Working on Elevators and covering firewall with insulation

03/15/07

Finished Rudder Pedals

04/15/07

Ordered brake hoses

05/10/07

Begin work on fiberglass engine cowl. Fitting and trimming

01/10/2008

Finish Tail surfaces - trim module, counterbalance cutouts, etc.

02/28/2008

Working on Panel layout and design

04/06/08

Attach Horizontal Stab

04/15/08

Attach Vertical Stab

05/01/08

Attach wings and install control sticks and control rods

06/01/08

Trim Vertical and attach rudder

06/09/08

Build and attach rudder stops

06/15/08

Fit rudder tip and elevator tips

06/24/08

Install tailwheel link

07/20/08

Fabricate rear control stick closeout

07/23/08

Fabricate fuel tank support brackets

07/24/08

Fitting horizontal fiberglass tips

08/01/08

Fabricate Fuel vent fittings and work on Fuel tank removal

08/06/08

Leak check fuel tanks and install fuel vent lines